Living in Issaquah Doing Business City Government Visitors - Recreation
City of Issaquah
   Home   
   Mayor & City Council   
   Departments   
   Contact Us   
   Jobs   
   Calendar   
   Services   
*
Back to Public Works Engineering
LINE

Public Works Permits / Street and Utility Standards
LINE
Transportation Program
LINE
Water, Sewer, and Stormwater Utilities
LINE
Water Quality
LINE
Stream Restoration
LINE
Flooding
LINE
CIP and TIP
LINE
Studies, Plans, Maps and Resources
LINE
Professional Services/Consultant Information & Rosters
LINE
Boards, Commissions & Committees
LINE
Newport Way Northwest
LINE

Bids/RFPs
LINE
Calendar Events
LINE
Staff Directory
LINE

PO Box 1307
City Hall Northwest
1775 12th Avenue NW
Issaquah, WA 98027
Phone: 425-837-3400
Fax: 425-837-3409
Email:
Hours: 8:00 AM - 5:00 PM
*
[sitemap] [advanced search]
*
CALENDAR OF:
MEETINGS & EVENTS
Today is:
September 2, 2010
DAY WEEK MONTH
Sep 2010
S M T W T F S
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30



Weather for 80401 powered by HamWeather.
98027 Conditions and Forecast


*
*
 
printer friendly version Printer friendly version
 / Public Works Engineering / 2008 Construction Projects & Traffic Alerts

2008 Construction Projects & Traffic Alerts

Project Information

Public Works Engineering is managing several construction projects in 2008.  Click on the figure at the right to download a detailed figure showing where construction will occur in 2008.  Projects are classified into street, water, sewer, stormwater, and other agency.

Additional project information on transportation projects can be found on the 2008 Transportation Project page.

Traffic Considerations

Normal construction hours for projects not located on principal roadways are 7 am to 6 pm weekdays.  If necessary, construction is allowed on Saturday with prior approval.  Special work hours, for certain projects to avoid peak hours on major arterials, are noted in the project descriptions.

Although many measures are typically taken to reduce traffic impacts, traffic will likely be delayed through the construction zones. When planning your trips through Issaquah please use alternative routes, or travel during non-construction hours, to minimize the possibility of being delayed by construction activities.

Current Status

For the current status of construction projects, move your mouse over the project labels on the map below to identify specific projects and (when clicked) take you to specific project information, including links to more detailed project web pages.

Newport Way & W. Sunset Traffic Signal ReplacementProvidence Point Safety ImprovementsNW Mall Street Local Improvement District 23I-90 Undercrossing Phase IWatermain ReplacementWildwood Pump Station RehabilitationCougar Ridge ReservoirPark Hill Creek ImprovementsLewis Creek Fish Passage ImprovementSE Issaquah Drainage ImprovementsIssaquah Transit CenterSR-900 Improvements Phase 2

Project Information:


TRANSPORTATION

 

Project A–1 Newport Way & W. Sunset Way Traffic Signal Replacement

 

Project Info

Name:

Newport Way & W. Sunset Way Traffic Signal Replacement

Description:

This project will replace the inadequate corner radii, change out the post-mounted signals with mast arm signal heads, add signing on signal mast arms, underground conduit, add new detector loops, modify the signal phasing and widen westbound approach on Sunset Way to provide for a right turn lane.

Location: 

Intersection of Newport Way and West Sunset Way

Contract Cost:

Estimated $600,00 total project cost

Contact:

Rory Cameron, 837-3451 (roryc@ci.issaquah.wa.us)

Pam Fox, 837-3423 (pamf@ci.issaquah.wa.us)

 Permits Required

Name

Contact

Phone

City Shoreline Exemption Permit

David Favour

(425) 837-3090

 Project Status:

Design:

100% completed

Permits:

All permits obtained

Bid Advertisement:

March 26, 2008, Bids Opened April 15, 2008

Contract Award: 

April 21, 2008

Est. Construction Start: 

June 25, 2008

Est. Substantial Completion: 

January 2009

Back to Top of Page


Project A–2 Complete Streets – Various Locations to be Determined

 

Project Info

Name:

Complete Streets

Description:

The City of Issaquah is planning for pedestrian and bicycle friendly facilities including sidewalk installation, bicycle lanes, striping, signing and crosswalks.  The Complete Streets formalizes the process that the City has been operating under in the past. 

This project will design and install new sidewalks while repairing existing sidewalks.  Staff will review pedestrian and travel to determine locations where new crosswalks or improvements to existing crosswalks are justified.  This program will also identify where bike lanes are necessary to complete missing links.  Locations will be approved by the City Council after their review.

Location: 

Various locations – to be determined

Contract Cost:

Estimated $500,000

Contact:

Gary Costa, 837-3443 (garyc@ci.issaquah.wa.us)

Rory Cameron, 837-3451 (roryc@ci.issaquah.wa.us)

Project Status:

Design:

In progress

Permits:

N/A

Bid Advertisement:

September 2008

Contract Award: 

September 2008

Est. Construction Start: 

November 2008

Est. Substantial Completion: 

Winter 2008

Back to Top of Page


Project A–4 NW Mall Street Local Improvement District 23

 

Project Info

Name:

NW Mall Street Local Improvement District 23

Description:

This project was initiated by the business owners along NW Mall Street.  The City of Issaquah passed Ordinance #2495 ordering the improvement of sidewalks for NW Mall Street.  This project will complete design and construction in 2008.  Improvements to include sidewalks, curb, gutter, and parallel parking on both sides of NW Mall Street between SR 900 and 12th Avenue NW.  Lighting will be installed all on one side of the street.

Location: 

NW Mall Street between SR 900 and 12th Ave NW

Contract Cost:

Estimated $ 1,050,000

Contact:

Rory Cameron, 837-3451 (roryc@ci.issaquah.wa.us)

Pam Fox, 837-3423 (pamf@ci.issaquah.wa.us)

Permits Required

Name

Contact

Phone

SEPA - Exempt

Peter Rosen

(425) 837-3094

Street Use Permit – Exempt

Bonita McPherren

(425) 837-3413

 

 

 

Project Status:

Design:

100 % complete

Permits:

Storm water - Department of Ecology; SEPA Exempt

Bid Advertisement:

Approximately July 2008

Contract Award: 

Approximately July 2008

Est. Construction Start: 

August 25, 2008

Est. Substantial Completion: 

January 2009

Back to Top of Page


Project A–5 I-90 Undercrossing – Phase I

 

Project Info

Name:

I-90 Undercrossing – Phase I

Description:

Phase I will construct the portion of the I-90 Undercrossing within Washington State Department of Transportation right of way under Interstate 90.

Location: 

The portion of I-90 Undercrossing under I-90 Bridge 

Contract Cost:

 

Contact:

Gary Costa, 837-3443 (garyc@ci.issaquah.wa.us)

Pam Fox, 837-3423 (pamf@ci.issaquah.wa.us)

Permits Required

Name

Contact

Phone

SEPA

Peter Rosen

(425) 837-3094

City Clearing and Grading

Bonita McPherren

(425) 837-3413

City Land Use ASDP Level 2

Peter Rosen

(425) 837-3090

Flood Hazard Permit

Kerry Ritland

(425) 837-3410

WSDOT General Permit

John Sutherland

(206) 440-4712

King County Permit Request to Alter Division Property

Robert Nunnenkamp

(206) 263-6207

Project Status:

Design:

In process

Permits:

In process

Bid Advertisement:

TBD

Contract Award: 

TBD 

Est. Construction Start: 

 

TBD

Est. Substantial Completion: 

 

TBD

 Back to Top of Page


Project A–6 Traffic Signal Upgrades

 

Project Info

Name:

Traffic Signal Safety Upgrades

Description:

This project will install traffic signal battery back-up equipment at the intersections.  This improvement would provide additional traffic safety at dark intersections when there are power failures and would allow the intersections to operate in normal and/or red flash modes during the power outages.

Location: 

Intersections of:  Front St. and Gilman Blvd.; Front St. and Sunset Way; Front St. and Newport Way/Clark; Front St. and 2nd Ave SE; Issaquah-Fall City Road and Issaquah-Pine Lake Road

Contract Cost:

Estimated $49,000

Contact:

Gary Costa, 837-3443 (garyc@ci.issaquah.wa.us)

Pam Fox, 837-3423 (pamf@ci.issaquah.wa.us)

Permits Required

Name

Contact

Phone

N/A

 

 

Project Status:

Est. Construction Start: 

Summer 2008

Est. Substantial Completion: 

Completed December 2008

Back to Top of Page


Project A–7 Radar Speed Signs

 

Project Info

Name:

Radar Speed Signs

Description:

Installation of radar speed signs

Location: 

Various locations

Contract Cost:

$35,000-

Contact:

Gary Costa, 837-3443 (garyc@ci.issaquah.wa.us)

Pam Fox, 837-3423 (pamf@ci.issaquah.wa.us)

Permits Required

Name

Contact

Phone

N/A

 

 

Project Status:

Design:

100% complete

Permits:

In process

Bid Advertisement:

N/A - King County contract

Contract Award: 

N/A

Est. Construction Start: 

Summer 2008

Est. Substantial Completion: 

Winter 2008/2009


Back to Top of Page


WATER

Project B-1 Watermain Replacements

 

Project Info

Name:

2008 Watermain Replacement

Description:

This project is to replace approximately 3,000 lineal feet of 4-inch and 6-inch diameter wrapped steel water main with 8” ductile iron including valves, water meters, and fire hydrants.

Location: 

  • NW Aires Place
  • Greenwood Blvd. SW
  • SW Mt. Fury Circle and easement from Mt Fury Circle to Mt Everest Lane
  • Intersection of Wildwood Blvd SW and Highwood Dr. SW. 

 

Contract Cost:

Estimated $383,539

Contact:

Tony Nguyen, 837-3437  (tonyn@ci.issaquah.wa.us)

Dale Dennis, 837-3454 (daled@ci.issaquah.wa.us)

Permits Required

Name

Contact

Phone

N/A

 

 

Project Status:

Design:

100% complete

Permits:

n/a

Bid Advertisement:

March 2008

Contract Award: 

April 2008

Est. Construction Start: 

March 31, 2008

Est. Substantial Completion: 

July 2, 2008

Back to Top of Page


Project B-2 -     Wildwood Pump Station Upgrade

 

Project Info

Name:

Wildwood Pump Station Upgrade

Description:

Replacement of water pump station to current earthquake codes along with replacing the mechanical and electronic control systems.

Location: 

Squak Mountain, at intersection of Wildwood Boulevard and Highwood Drive SW

Contract Cost:

$598,932.00

Contact:

Tony Nguyen, 837-3437  (tonyn@ci.issaquah.wa.us)

Dale Dennis, 837-3454 (daled@ci.issaquah.wa.us)

Permits Required

Name

Contact

Phone

Clearing and Grading

Bonita McPherren

(425) 837-3413

Building

John Minato

(425) 837-3105

Project Status:

Design:

Complete

Permits:

Complete

Bid Advertisement:

November 2007

Contract Award: 

January 2008

Est. Construction Start: 

March 2008

Est. Substantial Completion: 

March 2009

Back to Top of Page


Project B-3 Cougar Ridge Reservoir

 

Project Info

Name:

Cougar Ridge Reservoir Replacement

Description:

Construction of two new storage tanks on adjacent property and demolishing and disposing of existing steel storage tanks.

Location: 

56th Street SE, ¾ mile west of Newport Way.

Contract Cost:

Estimated $1,675,087

Contact:

Tony Nguyen, 837-3437  (tonyn@ci.issaquah.wa.us)

Dale Dennis, 837-3454 (daled@ci.issaquah.wa.us)

Brandon Cole, 837-3411

(brandonc@ci.issaquah.wa.us)

Permits Required

Name

Contact

Phone

Clearing Grading

Bonita McPherran

 425-837-3428

Building

John Minato

425-837-3105

Project Status:

Design:

100% complete

Permits:

Complete

Bid Advertisement:

March 2008

Contract Award: 

April 2008

Est. Construction Start: 

May 2008

Est. Substantial Completion: 

March 2009

 

Back to Top of Page


SEWER

 

Project C-2 Sewer Line Rehabilitation

 

Project Info

Name:

Sewer Main Rehabilitation

Description:

The project involves the cleaning, television inspection, and lining of sanitary sewer main in several locations in the City.

Location: 

TBD

Contract Cost:

TBD

Contact:

Tony Nguyen, 837-3437  (tonyn@ci.issaquah.wa.us)

Dale Dennis, 837-3454 (daled@ci.issaquah.wa.us)

Permits Required

Name

Contact

Phone

N/A

 

 

Project Status:

Design:

100% complete

Permits:

N/A

Bid Advertisement:

July 2008

Contract Award: 

August 2008

Est. Construction Start: 

September 2008

Est. Substantial Completion: 

October 2008


Back to Top of Page


STORMWATER

Project D–1 Park Hill Creek Restoration Project

 

Project Info

Name:

Park Hill Creek Restoration Project

Description:

Stream improvements along section of Park Hill Creek east of East Lake Sammamish Parkway

Location: 

Between Covenant Presbyterian Church and BMC West

Contract Cost:

Estimated $50,000

Contact:

Kerry Ritland, 837-3410 (kerryr@ci.issaquah.wa.us)

Dale Dennis, 837-3454 (daled@ci.issaquah.wa.us)

Permits Required

Name

Contact

Phone

SEPA

Peter Rosen

(425) 837-3094

City Clearing and Grading

Bonita McPherren

(425) 837-3413

City Land Use ASDP

Peter Rosen

(425) 837-3090

WDFW Hydraulic Project Approval

 

 

Corps of Engineers 404

 

 

Project Status:

Design:

100% complete

Permits:

In process

Bid Advertisement:

May 2008

Contract Award: 

June 2008

Est. Construction Start: 

July-August 2008

Est. Substantial Completion: 

August 11, 2008

Back to Top of Page


Project D–2 Lewis Creek Fish Passage Improvement

 

Project Info

Name:

Lewis Creek Fish Passage Improvement

Description:

Installation of rock weirs in Lewis Creek to eliminate passage barrier to kokanee salmon.  Also includes removal of flood-deposited debris from under 185th Place SE bridge on Lewis Creek

Location: 

SE 44th Street and 185th Place SE

Contract Cost:

Estimated $20,000

Contact:

Kerry Ritland, 837-3410 (kerryr@ci.issaquah.wa.us)

Dale Dennis, 837-3454 (daled@ci.issaquah.wa.us)

Permits Required

Name

Contact

Phone

SEPA

Kirk Prindle

(425) 837-3087

City Clearing and Grading

Bonita McPherren

(425) 837-3413

City Land Use ASDP

Kirk Prindle

(425) 837-3087

WDFW Hydraulic Project Approval

 

 

Corps of Engineers 404

 

 

Project Status:

Design:

100% complete

Permits:

In process

Bid Advertisement:

May 2008

Contract Award: 

June 2008

Est. Construction Start: 

June 30, 2008

Est. Substantial Completion: 

July 14, 2008

Back to Top of Page


Project D–3 SE Downtown Drainage Improvements

 

Project Info

Name:

SE Downtown Drainage Improvements

Description:

Installation of storm drains, water quality treatment devices, and infiltration systems to collect runoff from Sunset Way, 4th Place and Andrews Street.

Location: 

East Sunset Way, 4th Place SE, and SE Andrews Street

Contract Cost:

Estimated $200,000

Contact:

Kerry Ritland, 837-3410 (kerryr@ci.issaquah.wa.us)

Dale Dennis, 837-3454 (daled@ci.issaquah.wa.us)

Permits Required

Name

Contact

Phone

N/A

 

 

Project Status:

Design:

100% complete

Permits:

n/a

Bid Advertisement:

April 2008

Contract Award: 

May 2008

Est. Construction Start: 

June 9, 2008

Est. Substantial Completion: 

August 1, 2008

 Back to Top of Page


OTHER AGENCY PROJECTS

Project E1 - Issaquah Transit Center

Project Web Site Link (Sound Transit)

This Sound Transit project provides a new transit center at the site of the existing Issaquah Park-and-Ride at State Route 900 and Newport Way NW. The new transit center features over 800 parking stalls in a garage, bus layover space, six new bus bays with efficient loading areas, and weather-protected passenger shelters. The secure facility includes CCTV, customer emergency stations, a security office and police outpost. A passenger pick up/drop off area, bicycle storage, public art and rain gardens are also elements of project.

Construction will be completed this summer.  For more information, click on the link above for the Sound Transit web page for this project.

Back to Top of Page


Project E2 - SR-900 Phase 2

Project Web Site Link (WSDOT)

SR-900 will be expended to five lanes between Newport Way and just south of the Talus entrance.  This $33.8 million project will begin in Summer, 2008 and will be completed in Winter, 2009.  For more information, click on the link above for the WSDOT web page for this project.

Back to Top of Page




Aerial city photograph credit - Tim Heneghan

HOME    |    TOP    |    WEBSITE HELP    |    ABOUT THIS SITE


printer friendly version Printer friendly version

If you have questions regarding the site, please .
Terms of Use | Built using Project A's Site-in-a-Box ©2010